Author: Kulmatycski, K.
Paper Title Page
MO1BCO04 EIC Controls System Architecture Status and Plans 19
 
  • J.P. Jamilkowski, S.L. Clark, M.R. Costanzo, T. D’Ottavio, M. Harvey, K. Mernick, S. Nemesure, F. Severino, K. Shroff
    BNL, Upton, New York, USA
  • L.R. Dalesio
    Osprey DCS LLC, Ocean City, USA
  • K. Kulmatycski, C. Montag, V.H. Ranjbar, K.S. Smith
    Brookhaven National Laboratory (BNL), Electron-Ion Collider, Upton, New York, USA
 
  Funding: Contract Number DE-AC02-98CH10886 with the auspices of the US Department of Energy
Preparations are underway to build the Electron Ion Collider (EIC) once Relativistic Heavy Ion Collider (RHIC) beam operations are end in 2025, providing an enhanced probe into the building blocks of nuclear physics for decades into the future. With commissioning of the new facility in mind, Accelerator Controls will require modernization in order to keep up with recent improvements in the field as well as to match the fundamental requirements of the accelerators that will be constructed. We will describe the status of the Controls System architecture that has been developed and prototyped for EIC, as well as plans for future work. Major influences on the requirements will be discussed, including EIC Common Platform applications as well as our expectation that we’ll need to support a hybrid environment covering both the proprietary RHIC Accelerator Device Object (ADO) environment as well as EPICS.
 
slides icon Slides MO1BCO04 [1.458 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS2023-MO1BCO04  
About • Received ※ 05 October 2023 — Revised ※ 08 October 2023 — Accepted ※ 14 November 2023 — Issued ※ 11 December 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)