Paper |
Title |
Page |
TUMBCMO35 |
The SILF Accelerator Controls Plan |
449 |
|
- Z.Z. Zhou, L. Hu, M.T. Kang, G.M. Liu, T. Liu, T. Yu, J.H. Zhu
IASF, Shenzhen, Guangdong, People’s Republic of China
|
|
|
The Shenzhen Innovation Light Source Facility (SILF) is an accelerator-based multidiscipline user facility planned to be constructed in Shenzhen, Guangdong, Chi-na. This paper introduces controls design outline and progress. Some technical plans and schedules are also discussed.
|
|
|
Slides TUMBCMO35 [0.747 MB]
|
|
|
Poster TUMBCMO35 [0.545 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-ICALEPCS2023-TUMBCMO35
|
|
About • |
Received ※ 28 September 2023 — Revised ※ 08 October 2023 — Accepted ※ 06 December 2023 — Issued ※ 15 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|