Paper |
Title |
Page |
TUMBCMO20 |
Introduction and Status of Fermilab’s ACORN Project |
401 |
|
- D. Finstrom, E.G. Gottschalk
Fermilab, Batavia, Illinois, USA
|
|
|
Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory’s accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. An overview of the ACORN Project will be presented along with a summary of recent R&D activities.
|
|
|
Slides TUMBCMO20 [0.581 MB]
|
|
|
Poster TUMBCMO20 [0.455 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-ICALEPCS2023-TUMBCMO20
|
|
About • |
Received ※ 04 October 2023 — Revised ※ 10 October 2023 — Accepted ※ 06 December 2023 — Issued ※ 13 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|