Author: Liu, Y.
Paper Title Page
TUPDP052 The Progress and Status of HEPS Beamline Control System 650
 
  • G. Li, X.B. Deng, X.W. Dong, Z.H. Gao, G. Lei, Y. Liu, C.X. Yin, Z.Y. Yue, D.S. Zhang, Q. Zhang, Z. Zhao, A.Y. Zhou
    IHEP, Beijing, People’s Republic of China
  • N. Xie
    IMP/CAS, Lanzhou, People’s Republic of China
 
  HEPS will be the first high-energy (6GeV) synchrotron radiation light source in China which is mainly composed of an accelerator, beamlines and end-stations. In phase I, 14+1 beamlines and corresponding experimental stations will be constructed. The beamline control system design, based on EPICS, has been completed and will soon enter the stage of engineering construction and united commissioning. Here, the progress and status of the beamline control system are presented.  
poster icon Poster TUPDP052 [4.531 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS2023-TUPDP052  
About • Received ※ 01 October 2023 — Revised ※ 11 October 2023 — Accepted ※ 05 December 2023 — Issued ※ 17 December 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)