Author: Greve, N.
Paper Title Page
TUPDP013 Status on Continuous Scans at BESSY II 513
 
  • N. Greve, M. Brendike, D.K. Kraft, M. Neu, G. Pfeiffer
    HZB, Berlin, Germany
 
  Continuous energy scanning is an important feature for many beamlines at BESSY II. In 2015 this method was used at 11 Undulator and 6 dipol beamlines.[1] Since then the demand for this feature - especially among new build beamlines - increased, while the availability of the used hardware decreased. In order to tackle this problem, we investigate into alternative solutions for both, hardware and software. By introducing an independent high level controller between the two device controllers, we can compensate for communication incompatibilities and hence increase flexibility. This paper shows the status of our research. The ideas leading to a first prototype, the prototype itself and first results will be presented.
[1] A. F. Balzer et al., Status of the Continuous Mode Scan for Undulator Beamlines at BESSY II ,doi:10.18429/JACoW-ICALEPCS2015-THHA3O02
 
poster icon Poster TUPDP013 [0.855 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS2023-TUPDP013  
About • Received ※ 06 October 2023 — Accepted ※ 06 December 2023 — Issued ※ 10 December 2023  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)