Author: Finstrom, D.
Paper Title Page
TUMBCMO20 Introduction and Status of Fermilab’s ACORN Project 401
 
  • D. Finstrom, E.G. Gottschalk
    Fermilab, Batavia, Illinois, USA
 
  Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory’s accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. An overview of the ACORN Project will be presented along with a summary of recent R&D activities.  
slides icon Slides TUMBCMO20 [0.581 MB]  
poster icon Poster TUMBCMO20 [0.455 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS2023-TUMBCMO20  
About • Received ※ 04 October 2023 — Revised ※ 10 October 2023 — Accepted ※ 06 December 2023 — Issued ※ 13 December 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)