JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


RIS citation export for TUMBCMO37: Personnel Safety Systems for ESS Beam on Dump and Beam on Target Operations

TY  - CONF
AU  - Mansouri, M.
AU  - Abujame, A.
AU  - Andersson, A.
AU  - Carroll, M.
AU  - Daryadel, D.
AU  - Eriksson, M.
AU  - Farshidfar, A.
AU  - Foroozan, R.
AU  - Harahap, V.A.
AU  - Holgersson, P.
AU  - Lastow, J.
AU  - Ljungquist, G.L.
AU  - Naicker, N.
AU  - Nordt, A.
AU  - Paulic, D.
AU  - Petrushenko, A.
AU  - Plotnikov, D.A.
AU  - Takzare, Y.
ED  - Schaa, Volker RW
ED  - Götz, Andy
ED  - Venter, Johan
ED  - White, Karen
ED  - Robichon, Marie
ED  - Rowland, Vivienne
TI  - Personnel Safety Systems for ESS Beam on Dump and Beam on Target Operations
J2  - Proc. of ICALEPCS2023, Cape Town, South Africa, 09-13 October 2023
CY  - Cape Town, South Africa
T2  - International Conference on Accelerator and Large Experimental Physics Control Systems
T3  - 19
LA  - english
AB  - The European Spallation Source (ESS) is a Pan-European project with 13 European nations as members, including the host nations Sweden and Denmark. ESS has been through staged installation and commissioning of the facility over the past few years. Along with the facility evolution, several Personnel Safety Systems, as key contributors to the overall personnel safety, have been developed and commissioned to support the safe operation of e.g. test stand for cryomodules Site Acceptance Test, test stand for Ion Source and Low Energy Beam Transport, and trial operation of the Normal Conducting Linac. As ESS is preparing for Beam on Dump (BoD) and Beam on Target (BoT) operations in coming years, PSS development is ongoing to enable safe commissioning and operation of the Linear Accelerator, Target Station, Bunker, and day-one Neutron Instruments. Personnel Safety Systems at ESS (ESS PSS) is an integrated system that is composed of several PSS systems across the facility. Following the experience gained from the earlier PSS built at ESS, modularized solutions have been adopted for ESS PSS that can adapt to the evolving needs of the facility from BoD and BoT operations to installing new Neutron Instruments during facility steady-state operation. This paper provides an overview of the ESS PSS, and its commissioning plan to support BoD and BoT operations. 
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 452
EP  - 455
KW  - MMI
KW  - operation
KW  - neutron
KW  - radiation
KW  - target
DA  - 2024/02
PY  - 2024
SN  - 2226-0358
SN  - 978-3-95450-238-7
DO  - doi:10.18429/JACoW-ICALEPCS2023-TUMBCMO37
UR  - https://jacow.org/icalepcs2023/papers/tumbcmo37.pdf
ER  -